5 steps / beginner guide

Get ready for bulk production

Get your streetwear collection ready for production, quality checks and delivery.

  1. Garment Sample Approval Checklist: One Comment Sheet, One Revision Trail

    STEP 1 OF 5

    Confirm the approved sample

    Inspect a garment sample in 15 steps, then carry every measured, photo-linked comment through response, verification and closure without losing the history.

    Read the guide →
  2. Garment Pre-Production Meeting Checklist Before Bulk

    STEP 2 OF 5

    Align the production team

    Prepare and record a garment pre-production meeting with controlled inputs, scoped decisions, action owners, blocking effects and reopen triggers before bulk work.

    Read the guide →
  3. AQL 2.5 Explained: What Garment Buyers Should Specify

    STEP 3 OF 5

    Plan inspection checks

    AQL 2.5 is one input to a garment acceptance-sampling plan, not a promise that 2.5% defects are allowed. Learn what buyers need to agree before inspection.

    Read the guide →
  4. Carton Marking Checklist for Clothing Orders

    STEP 4 OF 5

    Prepare carton records

    Build a project-specific carton-mark record: trace every field to its owner and revision, reconcile each carton to the order, and separate visual, print and scan evidence.

    Read the guide →
  5. FOB, EXW, CIF or DDP? Shipping Terms Decoded for First-Time Importers

    STEP 5 OF 5

    Agree on shipping responsibilities

    Each shipping term is a handover point: who pays what and where risk transfers under EXW, FOB, CIF and DDP — and which fits a 50-300 piece first order.

    Read the guide →
What you will work through

Prepare a shared approval record and the questions to resolve before production, inspection and shipping. Follow the steps in order, or jump to the question you have now.

Ready to discuss your project?

Send your design and project details to our team.

Talk to Jiashun →
Chat on WhatsApp